Blacktown ESAPs
Elevated safe access platforms in a live stabling yard — design review and delivery strategy, with Aurecon for TfNSW.
CPRP — Central Precinct Renewal Program
Renewal of the precinct in and around Sydney’s Central Station, for Transport for NSW.
Clyde Junction — Stages 1 & 2
Resignalling and junction works in the corridor between Auburn and Granville, with Aurecon.
Cross River Rail — Mayne Yard
Queensland Rail’s main stabling and maintenance precinct, for CRRDA.
Cross River Rail — Northern Portal
Northern tunnel portal works in Brisbane, for CRRDA with Queensland Rail.
Cross River Rail — Southern Portal
Southern portal works between Park Road, Dutton Park and Buranda, for CRRDA.
Epping to Thornleigh Third Track
A third track on the Main North line, built alongside live running lines to separate freight from passenger services.
Fast Rail
Planning and constructability input on the NSW Fast Rail programme, with WSP.
Hornsby Maintenance Centre Upgrade
Reference design constructability report for maintenance Roads 1 to 3, with ARCH Artifex and Aurecon.
Kiama to Bomaderry
Planning support on the single-track section of the South Coast line, for Transport for NSW.
LAR2 — Lithgow Area Resignalling
Overhead wiring, signalling and track modifications in the Lithgow area, for Sydney Trains.
LMNQL — Lower Main North Quadruplication Lite
Capacity works on the lower Main North line, including the Up Relief Extension, with Geodata for the NSRU Alliance.
North Strathfield Brownfield and Greenfield Works
Two packages split by the constraint that governs them — inside the rail corridor, and clear of it.
North Strathfield Enabling Works
Preparing the North Strathfield station site for main construction on Sydney Metro West.
PPC — Project Planning and Control
FR2’s continuing planning and controls engagement with HSEJV.
Regional Rail Enabling Works
Enabling works for the replacement of the ageing NSW regional rail fleet.
SMP4 — Southwest Metro Upgrade Package 4
Station conversion at Canterbury, Marrickville and Sydenham, delivered via HSEJV.
SCATL — Sutherland to Cronulla Active Transport Link
Constructability technical memo for a walking and cycling route along the Cronulla rail corridor, with FutureRail.
Sydney Metro City & Southwest — Central Northern Entry
New entry and concourse connections at Central Station, with WSP.
Sydney Metro City & Southwest — Yagoona Station Terminus
Construction planning, staging and scheduling support for the terminus works.
Sydney Metro West — Central Tunnelling Package
Twin 11 km tunnels and five station boxes, delivered in portions by AFJV.
Sydney Metro West — Westmead to The Bays
Planning input across the western alignment and the EIS2 and EIS3 stages.
TAP4 — Yennora Station
Transport Access Program accessibility upgrade, with Jacobs and ARCH Artifex.
TAP4 — Bardwell Park Station
Transport Access Program accessibility upgrade, with Aurecon and ARCH Artifex.
TAP4 — Carramar Station
Transport Access Program accessibility upgrade, with Jacobs and ARCH Artifex.
TAP4 — Chester Hill Station
Transport Access Program accessibility upgrade, with Aurecon and ARCH Artifex.
TAP4 — Macquarie Fields Station
Transport Access Program accessibility upgrade, with Jacobs and ARCH Artifex.
Westmead Enabling Works
Utility, demolition and site establishment works preparing the Westmead end of Sydney Metro West.
Zero Emission Buses — Depot Definition Design
Depot definition design for the transition of the NSW bus fleet to zero emissions, with FutureRail.
Recent Projects
- Central Precinct Renewal Program (CPRP – Link)
- Blacktown ESAPs (Elevated Safety Platform Access)
- Sydney Metro City & Southwest – Yagoona Station Terminus
- Regional Rail Enabling Works (Link)
- Transport Access Program Tranche 4 (TAP4) – Carramar, Macquarie Fields and Yennora Park Stations – Technical Advisory Services
- Transport Access Program Tranche 4 (TAP4) Wave 1 Package 2 – Bardwell Park and Chester Hill Stations – Technical Advisory Services
- Haslin Constructions and Stephen Edwards Constructions, (HSEJV)- SMP4 (Southwest Metro Upgrade – Package 4, Canterbury, Marrickville and Sydenham Stations), PPC (Project Planning and Control) – Link
- Lithgow Area Resignalling Stage 2 (LAR2) –
- Hornsby Maintenance Centre Facility Upgrade
- Sydney Metro West (Westmead to The Bays), Sydney Metro West is a new 24-kilometre metro line with stations confirmed at Westmead, Parramatta, Sydney Olympic Park, North Strathfield, Burwood North, Five Dock, The Bays, Pyrmont and Hunter Street in the Sydney CBD – Link
- Sydney Metro EIS2 (Westmead to The Bays) – Link
- Sydney Metro EIS3 (Westmead to The Bays) – Link
- North Strathfield Brownfield/Greenfield Works – Link
- Moss Vale Station Upgrade – Link
- Tuggerah Station Upgrade – Link
- Sydney Metro West – EIS3 (EDS, Sydney Metro) – Link
- Clyde Resignalling (Aurecon, TfNSW)
- Westmead Enabling Works (Sydney Metro)
- North Strathfield Enabling Works (Sydney Metro)
- Sydney Metro West – EIS2 – Link
- Fast Rail (WSP, TfNSW)
- Kiama to Bomaderry Project (TfNSW) – Link
- Cross River Rail, Mayne Yard (CRRDA, Queensland Rail)
- Cross River Rail, Northern Portal (CRRDA, Queensland Rail)
- Cross River Rail, Southern Portal (CRRDA, Queensland Rail)
- Epping to Thornleigh Third Track (TfNSW) – Link
- Parramatta Turnback Project – Link
- South Eveleigh Intercity Service Centre – Link
- Hornsby Planning Services, Hornsby Junction Remodelling
– critical-path scheduling software Program
– Risk Analysis - Regional Stabling Options
- Western Sydney Rail Upgrade
- Technical Advisor Support for Substations, Guildford Substation
- Lower Main North Quadruplication Lite (LMNQL) (Geodata, NSRU Alliance) – Link
- Clyde Junction Project Stage 12 Project at Auburn NSW.
- Clyde Junction Project Stage 13 at Clyde and Granville NSW.
- North Strathfield Rail Underpass Project.
- Arncliffe Pedestrian Access Project
- Granville to Westmead Resignalling
- Northern Sydney Freight Corridor Program – Stage 2
- Lower Main North Quadruplication Lite – Up Relief Extension
- Sydney Rail Futures (SRF) Stage 2 (2019-2025 Projects)
- Northern Sydney Freight Corridor Program.
Rhodes to West Ryde Quadruplication, Project definition design – Link - Berowra to Hawkesbury River Triplication, Project definition design.