Acciona Ferrovial Joint Venture
AFJV is the joint venture between Acciona and Ferrovial, two international infrastructure contractors, formed to deliver major transport packages in Australia.
Background
AFJV holds the design-and-construct contract for the Sydney Metro West Central Tunnelling Package, awarded July 2021 at $1.96 billion. Joint ventures of this scale are formed for major tunnelling and station packages, where the bonding capacity, plant and international delivery experience required exceed what a single contractor would carry.
Projects
Work FR2 has contributed to involving AFJV, as listed on Our Experience:
- Sydney Metro West — Central Tunnelling Package — twin 11 km tunnels and five station boxes, delivered as portions:
- Portion 1B — The Bays (TBY)
- Portion 2 — Tunnels
- Portion 2A — Five Dock
- Portion 2A.1 — Tunnels
- Portion 2B — Burwood
- Portion 2D — North Strathfield
- Portion 3A — Sydney Olympic Park (OLP)
- Handover item locations — segment manufacturing facility
- North Strathfield Brownfield and Greenfield Works
Capabilities and services
Scheduling
Critical-path scheduling baselines, live programme management, progress tracking and forecasting.
Construction planning
Methodology, staging and possession strategy built around how the work is actually delivered.
Constructability
Reviews and reports that surface buildability risk while the design can still change.
Risk management
Programme risk identification, quantification and mitigation planning.
People
FR2 is a small team, and the same people carry the work across engagements. The full team — roles, background and the capability matrix showing who covers what — is on Who We Are.
Related
Our Experience
The full record of programmes FR2 has planned and controlled.
All services
Planning, constructability, project controls and commercial support.
Rail & Transit
Live rail environments, possessions, resignalling and station upgrades.
All clients
Every organisation FR2 has worked for.